Stucked walls.
To eliminate various defects and cracks between concrete slabs, plaster is widely used. Using it for construction purposes allows you to prepare various surfaces for subsequent processing, including wallpaper sticking or wall painting. Thanks to significant progress in the construction and final region, at present, plaster work has become able to do each person.
Before starting plaster work on your own, you need to take care of preparing the surface on which you are going to work. In situations where tiles were previously glued on the wall, traces of old glue, as well as old plaster, can remain on it. The surface of the surface is carried out using the same technology as the plaster of the walls.
For the preparation of a plaster solution, it will be more convenient to take a metal bucket or pelvis, also two spatulas will be needed for work, the optimal width of the first working surface of the first should be 10-15 cm, and the second-40-60. In addition, the aluminum rule is useful in the work, it is better if its length does not exceed a meter, and a mixer for electric drill.
When all working tools are prepared, you can proceed to direct cooking of the solution. It is worth pouring water in an aluminum bucket or pelvis, in the amount of one third of the total capacity, then it should be poured into one quarter of the packaging of the plastering mixture and stir with a mixer or spatula until a homogeneous mass resembles thick sour cream.
We throw the finished mixture using a small spatula to the surface and using the rule evenly distribute it across the wall. It is better to apply plaster on the wall in small portions, otherwise you can create a significant ledge, which will subsequently be problematic to smooth out. Obtaining a smooth plastered surface can be achieved using a spatula lowered in water. The spatula relative to the wall should move at an angle of 45 degrees, you can not allow pressure on it, otherwise it will not be possible to get a flat surface.
After the end of the plaster is completed, it will take about one or one and a half days to dry out. In the presence of serious flaws in the wall, it may require the application of the second layer of plaster, the process of re -supervision should be carried out strictly after the first layer is completely dried. You can get rid of flaws in the work with sandpaper. After complete leveling, it will be possible to begin further decoration of the wall.