Typically, the cost of building a house from aerated concrete is indicated for a square meter. Moreover, the work and the materials used in the process are already included in its cost. The value of the price varies depending on the technology used by the Contractor. In addition, the type of project that is implemented in life matters. Individual, of course, will be somewhat more expensive.
What do specialized work executive organizations offer today? Consider three different configurations:
box at home;
warm circuit;
turnkey.
Please note that the first equipment is basic, the second is the first with some additions, and the third is the second with a number of additional elements.
The construction of the building according to the first configuration will cost the customer 12.5 thousand. rubles per square meter. At the same time, the contractor undertakes to fill the foundation (unarmed). Equip walls and partitions. For load-bearing walls, a reinforced 300-mm aerated concrete is used, the density of which is D500. With volumetric reinforcement, door and window jumpers were also performed. House floors are equipped with wood beams with mandatory impregnation with an antiseptic. For the installation of the roof, a special rafter system is used. The cost of the work also includes the installation of the counterparty and the wind paneling layer. The roof is insulated using 200 mm plates (basalt wool).
The cost of configuration No. 2 is 16.4 thousand. rubles for “square”. In addition to the above, the contractor promises:
arrangement of brick chimneys with an internal sleeve and ventilation channels;
installation of drains around the perimeter of the structure;
overhang arrangement (bilateral painting, impregnation with an antiseptic);
laying of decorative plaster along the entire plane of the facade;
tackle finishes;
Installation of the front door (metal) and metal -plastic window structures (energy -saving film and double -glazed glass packet).
The third option is the most expensive. The cost of one square meter is 25.4 thousand. rubles for one square meter. Here, two more types of work are added to the project. The first is the installation of internal communications: wiring, ventilation, water supply, heating and sewage. Second – interior decoration. It means finishing the surface of the ceilings with drywall, plastering the walls of the house, installation of window sills, partitions, slopes. Finally, in addition to insulation of the overlap with basalt wool (200 mm stoves), plywood flooring is performed.
On the features of the material
What moments the technology for building a house from aerated concrete regulates? It should be noted that, despite the simplicity of installation operations with this material, all the actions performed are clearly regulated by the relevant rules and regulatory documentation. To imagine what is about, it is necessary to briefly list all the moments that require certain experience and knowledge of technology. So, here they are:
competent construction of walls using blocks from the mentioned material;
the correct arrangement of the foundation for such walls;
a special procedure for laying blocks;
execution of jumpers and openings (door and window) of the right size;
properly performed installation of partitions;
proper reinforcement of masonry;
competent installation of rafter structures and attic floors.
The listed list is not exhaustive. So, for example, there is a certain order according to which external decoration of the walls of the structure is performed, the application of protective and decorative coatings is eliminated, surgical defects are eliminated.
Also, a special tool is used to work with blocks from this material.
Thus, we can conclude that the cost of the given sets is quite justified. Moreover, each of them implies not only well -completed work and correctly selected materials, but also the preparation of the project of housing construction. It is obvious that such integrated work should be carried out only by specialized executive organizations.