Stucked walls.

Plaster – the best method for leveling walls.

Nowadays, one of the three following methods are usually used to align walls and ceiling:

Suy method – it involves alignment using drywall or other finishing panels.

Wet method is wall plaster.

B the third method – combined, t. e. The walls are plastered, and the ceiling is made of piece materials.

In this article, I would like to describe in more detail the process of wall decoration and ceiling using plaster.

It is worth paying tribute to this simple material, because it is thanks to it that you avoid the appearance of seams, joints and voids, which cannot be handled with the help of finishing panels. Also, the advantages of this method include

Monolithic;

Durability (plaster will last 25 years);

Easy in choosing finishing materials, since any is suitable for the plastered surface;

Technological accuracy (when using high -quality plaster, the ceiling and walls are leveled with a tolerance of 2 mm per 2 kV. m);

Plastic. Using a wet alignment method, a wide variety of ideas can be realized;

Environmental friendliness of the material;

Practicality in use;

Getting rid of the problem of fasteners (mounting items and furniture mount).

It’s no secret that the work of the Russian communal system is far from the ideal. In such conditions, a very important point is the water resistance of the plaster. Explain the example: if suddenly you were filled with neighbors or a leak of water occurred directly in your apartment, then with quick and coordinated actions to remove water, drying and ventilation, plaster will not suffer. Moreover, even if a certain amount of water has already managed to absorb into the surface, then the plaster will gradually give it out and the overall interior is preserved in the primary form. When using the dry alignment method, water will undoubtedly ruin the appearance of the room.

Also, an indisputable advantage of using plaster is to save space. Simple arithmetic: with a minimum layer (1 cm) plaster, room space in 20 square meters. m. will decrease by 1.5 kV. m, and with an average layer (2 cm) plaster only 0.5 m. kV more. It should be noted that the dry method of leveling walls and ceiling, which also needs to be done in the entire apartment, in an apartment with an area of ​​100 kV. m. “Eat” 7-10 sq. m.